Labs and Studios - April 2025

Date: 
Wednesday, April 16, 2025 - 11:45am

Labs and Studios Minutes –April 16 2025

AC 147 and zoom

 

Present:   M. Sorokopud, G. Oba, A. Diochon, T. Moore, B.Huska, J. Miller, J. Gao, S. Girvin, K. Bhatia

 

TIME Commenced: 11:09 am hybrid by zoom

Agenda :  MOTION A.D. SECOND T.M. Carried. 

March 2025 Minutes: MOTION  S.G. SECOND A.D.

 

Injuries/Incidents

None

Inspections - 

Fire Lab inspection completed by A. Diochon - Report in folder, waiting on response

March Inspections to be scheduled by committee members (send invite to H&S to accompany when available)

  • LUEL - M. Sorokopud - Still in the process of scheduling

  • Geology - J. Sylvestre - Will follow up

 

April Inspections:

  • Visual Arts - G. Oba

  • Civil Engineering - A. Diochon if available Tues April 22. If not J. Gao will do end of April

  • Lot 5 Research Lab - M. Sorokopud Wed April 23 2pm

 

Old Business

  • Mechanical Engineering - Exhaust fan and missing ceiling tiles

    • Update 2025-03-19 - Work order has been issued to address, S. Girvin will check on status

    • Update 2025-04-16 - Fan has arrived, install should begin next week

  • EPID@Work presentation reminder

  • Terms of reference - Complete final comments by Friday April 25, approval next meeting

 

New Business

  • ESA Inspections took place for the Braun building with a number of items to be addressed. For equipment that require certification local contact: kevin.schiiler@intertek.com

  • Bed in office space was found, reminder about keeping an eye out for this type of thing. If we suspect someone is having trouble with secure housing or domestic violence we are obligated to provide resources. Address work life balance with students and staff if needed.

  • Plab for administrative oversight was approved by PHAC as a requirement of our continued biohazard permit. 

  • Hazardous waste pickup is in the works, there is an audit from the MOE on waste streams. Hazardous waste is not involved currently.

 

Other Business

  • J. Gao - Leaking nitrogen regulator on wall  in gas room in CASES building. Steve will look into this

  • S. Girvin - Electrical shutdown on Sat May 3, 2025. Received request by researcher to have students continue to work outside with generators. Was denied due to lack of fire system, water and electricity inside building which could be accessed, and emergency systems for security.

 

Adjournment:  11:49am

 

NEXT REGULAR MEETING: May 21, 2025 time 11:00am